Phase 10 · coupling, negative controls, assumption audit
Coupling & Negative Controls
AT-0073 → AT-0080. If identity and relational address are separate coordinate blocks, an optimiser will always move one without disturbing the other. That is factorisation, not physics. This lab couples them on purpose and measures what survives.
Set κ to zero and watch every decoupling metric jump to a perfect score. That is the point of the control: the perfect score means the model was factorised, and the gate below will refuse to promote it.
Î(x) = I + κ · M · R, progress = 1 − ‖R* − R‖ / ‖R* − R₀‖
Running the seeded coupling sweep…