Phase 45 · geometry as infrastructure / local reservoir accounting
Cheap trip or prepaid trip?
AT-0353 → AT-0362, canonical AT-0381 → AT-0390. Deterministic toy benchmark seed 353. Phase 44 left exactly one mechanism class standing: a medium charged up in advance. This package prices it. Every edge of the route holds a stored resource, every transit drains it, recharge is bounded and local, and the marginal figure is never quoted without the fully amortized one beside it.
The lesson before the numbers
Loading.
Plain language
Controls
Running the infrastructure accounting package…