Skip to content
Adjacency Theory markAdjacency Theory

Phase 31 · timing

When you change the coupling matters

AT-0239 → AT-0246. A two-stage schedule with no feedback matched — and often beat — the adaptive rule at equal relational progress. That is a warning, not a breakthrough, so this package prices the control channel, forbids near-decoupling, and asks whether the benefit is protection or cancellation.

Core objective, unchanged

The target is unchanged: substantial genuine relational-location change while preserving identity and invariants, under locality, bounded propagation, finite action, no hidden debt, robustness, scale persistence and nontriviality. A mechanism that only looks protective because it is allowed to nearly switch the interaction off has avoided the problem, not solved it.

Controls

Running the timing package — optimising the schedule, sweeping coupling floors and re-running every audit. This takes a few seconds.